Friday, 16 September 2011

Planning

17th September, 2011. Today (16th) we met up in Uni after class to discuss what we about to do from where we left of last week after signing the contract. Since we installing air bags in a baby seat we decided to meet up with a mate of Peters who installs air bags. Since we have this arranged we are now able to move on further into our project and also discuss what each of our individual task would be in order to complete this project. 

Wednesday, 7 September 2011

The Contact.

7th September, 2011. Finally having our contact signed and now its time to for us to get together so we can work on it. Garry gave us a lot of ideas when we spoke to him and now we confident that we can work on this project. We have decided to come up with a baby seat that has kinetic air bags for babies when an accident occurs to prevent babies from getting whip lashes and so on. With this design we'll be looking into safety and presentation of whip lashes caused during the accident. Till then we'll be meeting up every Wed for our group project and maybe if there is time we can all meet on regular bases during the week.

Monday, 5 September 2011

Change of Plans

31st of August, 2011. Had to change my group cause Peter was on his own, so decided to join him since there was 3 in my old group. Anyway i meet up with my new group and had a chat on out new group project. Came up with a lot of ideas but some where pretty tough to crack in terms of idea that's way beyond our capability. So we came up with an idea, something to do with seat beats on a 1955 Mossis Miner. For this vehicle it has no seat beats so we planning on doing something to it and deciding what other ideas we can come up with. Had a chat with Garry and was ok with the idea.. so will be speaking to Lixin just to confirm it.